Searched full:involves (Results 1 – 25 of 434) sorted by relevance
12345678910>>...18
23 - If the new functionality involves operations where the kernel notifies127 If your new :manpage:`xyzzy(2)` system call involves a filename argument::147 If your new :manpage:`xyzzy(2)` system call involves a parameter describing an151 If your new :manpage:`xyzzy(2)` system call involves privileged functionality,253 way (see below), this involves a "common" entry (for x86_64 and x32) in311 If the system call involves a structure that is laid out differently on 32-bit404 This is arch-specific, but typically involves defining assembly entry points464 involves a new userspace-visible structure, the corresponding header will need
26 - If the new functionality involves operations where the kernel notifies130 If your new :manpage:`xyzzy(2)` system call involves a filename argument::150 If your new :manpage:`xyzzy(2)` system call involves a parameter describing an154 If your new :manpage:`xyzzy(2)` system call involves privileged functionality,256 way (see below), this involves a "common" entry (for x86_64 and x32) in314 If the system call involves a structure that is laid out differently on 32-bit407 This is arch-specific, but typically involves defining assembly entry points467 involves a new userspace-visible structure, the corresponding header will need
27 * Enabling/disabling an interrupt line involves asserting/clearing28 * the corresponding bit in IMR. ACK'ing a request simply involves
7 - in the user-space fastpath a PI-enabled futex involves no kernel work79 mutexes involves no kernel work at all - they behave quite similarly to
32 * Enabling/disabling an interrupt line involves asserting/clearing33 * the corresponding bit in IMR. ACK'ing a request simply involves
11 involves determining the ARS capabilities of a given address
23 all the other channels, since it involves changing the VCO
8 involves one or more virtual Ethernet switches overlaid on the Omni-Path108 It involves HW resource allocation/management for VNIC functionality.
8 /* The right way to do this involves valignb
9 * The right way to do this involves valignb
11 cases involves slightly different operations and different interactions with
14 to route interrupts across various subsystems. It involves a three-level
52 DSC overlap method involves polling the tape's status register
26 /* bit set means command submit involves a preamble IB */
19 * OPFN involves the communication between two QPs on the HFI
16 Aggregation is required to achieve high data rates. This involves hardware
21 /* The right way to do this involves valignb
22 * The right way to do this involves valignb
30 The board only supports DMA on the receive side. Transmission involves
12 involves one or more virtual Ethernet switches overlaid on the Omni-Path114 It involves HW resource allocation/management for VNIC functionality.
55 DSC overlap method involves polling the tape's status register
15 cases involves slightly different operations and different interactions with