Home
last modified time | relevance | path

Searched refs:contracting (Results 1 – 11 of 11) sorted by relevance

/external/eigen/unsupported/Eigen/CXX11/src/Tensor/
DTensorContraction.h240 bool contracting = false;
243 contracting = true;
247 if (!contracting) {
267 bool contracting = false;
271 contracting = true;
275 if (!contracting) {
/external/parameter-framework/upstream/
D.clang-format36 # Disallows contracting simple braced statements to a single line
/external/deqp/external/openglcts/
D.clang-format22 # Allows contracting simple braced statements to a single line.
/external/swiftshader/third_party/llvm-7.0/llvm/lib/Target/Hexagon/
DHexagonISelDAGToDAGHVX.cpp850 OpRef contracting(ShuffleMask SM, OpRef Va, OpRef Vb, ResultStack &Results);
1239 OpRef C = contracting(SM, Va, Vb, Results); in shuffs2()
1418 OpRef HvxSelector::contracting(ShuffleMask SM, OpRef Va, OpRef Vb, in contracting() function in HvxSelector
/external/tensorflow/tensorflow/compiler/xla/
Dxla_data.proto525 // The dimension numbers that represent the 'lhs' contracting dimensions.
527 // The dimension numbers that represent the 'rhs' contracting dimensions.
/external/tensorflow/tensorflow/compiler/xla/g3doc/
Doperation_semantics.md919 As Dot, but allows contracting and batch dimension numbers to be specified for
924 | 'lhs_contracting_dimensions' | repeated int64 | 'lhs' contracting dimension numbers |
925 | 'rhs_contracting_dimensions' | repeated int64 | 'rhs' contracting dimension numbers |
929 DotGeneral performs the sum of products over contracting dimensions specified
932 Associated contracting dimension numbers from the 'lhs' and 'rhs' do not need
935 Example with contracting dimension numbers:
986 then the 'lhs' non-contracting/non-batch dimension, and finally the 'rhs'
987 non-contracting/non-batch dimension.
/external/clang/docs/
DClangFormatStyleOptions.rst236 Allows contracting simple braced statements to a single line.
/external/brotli/tests/testdata/
Dlcet10.txt326 the most time-consuming aspect of contracting out conversion. ERWAY
4278 * Quality control the most time-consuming aspect of contracting out
4356 Government contracting procedures and time frames posed a major challenge
4365 aspect of contracting out conversion. AM has been attempting to perform
/external/jline/src/src/test/resources/jline/example/
Denglish.gz
/external/cldr/tools/java/org/unicode/cldr/util/data/transforms/
Dinternal_raw_IPA.txt35551 contracting %39123 kˈɑntræktɪŋ
Dinternal_raw_IPA-old.txt42103 contracting %29022 kˈɑntræktɪŋ