Lines Matching +full:ethernet +full:- +full:switch
4 Contact: Robert Love <robert.w.love@intel.com>, devel@open-fcoe.org
11 per-port settings and finally write to the fcoe_ctlr_device's
25 Contact: Robert Love <robert.w.love@intel.com>, devel@open-fcoe.org
57 Initialization Protocol (FIP) Keep-Alives (FKA).
71 Contact: Robert Love <robert.w.love@intel.com>, devel@open-fcoe.org
73 Forwarder, which is a FCoE switch that can accept FCoE
74 (Ethernet) packets, unpack them, and forward the embedded
76 outbound FC frames and pack them in Ethernet packets to
77 be sent to their destination on the Ethernet segment.
84 priority: The switch's priority amongst other FCFs on the same
87 selected: 1 indicates that the switch has been selected for use;
88 0 indicates that the switch will not be used.
96 fka_period: The FIP Keep-Alive period
99 "Unknown" - Initialization value
100 "Disconnected" - No link to the FCF/fabric
101 "Connected" - Host is connected to the FCF
102 "Deleted" - FCF is being removed from the system
116 which is commonly packaged in the fcoe-utils package.