Lines Matching full:scheduling
2 Energy Aware Scheduling
8 Energy Aware Scheduling (or EAS) gives the scheduler the ability to predict
20 because this is where the potential for saving energy through scheduling is
88 scheduling domains are built, or re-built. For each root domain (rd), the
312 (than CFS) scheduling classes (as well as IRQ) must be taken into account. As
314 by CFS tasks, but also by the other scheduling classes and IRQ.
320 Energy Aware Scheduling depends on the CPUs of the system having specific
331 looking for the presence of the SD_ASYM_CPUCAPACITY flag when the scheduling
345 EAS uses the EM of a platform to estimate the impact of scheduling decisions on
350 Please also note that the scheduling domains need to be re-built after the
367 A complexity check is performed at the root domain level, when scheduling